President 1414: Difference between revisions

Language label (Hebrew) for links to Hebrew-language sites
Internal links: link the first mention of articles that the Hebrew edition links to
Line 12: Line 12:
The building underwent a complete renovation from the foundations in the late 1990s, and for several years it stood abandoned.
The building underwent a complete renovation from the foundations in the late 1990s, and for several years it stood abandoned.


Over the years people asked Rabbi [[Yekusiel Menachem Rapp|Kuty Rapp]] when the building would open, and he told them, "When the Twin Towers fall, then the yeshivah will open"... On 23 Elul 5761 (2001), a few hours before the opening of the dormitory, the Twin Towers fell.
Over the years people asked Rabbi [[Yekusiel Menachem Rapp|Kuty Rapp]] when the building would open, and he told them, "When the Twin Towers fall, then the yeshivah will open"... On [[23 Elul]] 5761 (2001), a few hours before the opening of the dormitory, the Twin Towers fell.


A laundry room was added in the basement of the building<ref>[https://770live.com/heb770/news/news_item.asp?NewsID=1226&PagePosition=98 A laundry room inaugurated in the dormitory at 1414] <!-- Hebrew template: {{770live}} --></ref>. The "Getzel Shul" synagogue was also built there, in which some of the farbrengens with the yeshivah's staff of rabbis and various shiurim are held.
A laundry room was added in the basement of the building<ref>[https://770live.com/heb770/news/news_item.asp?NewsID=1226&PagePosition=98 A laundry room inaugurated in the dormitory at 1414] <!-- Hebrew template: {{770live}} --></ref>. The "Getzel Shul" synagogue was also built there, in which some of the farbrengens with the yeshivah's staff of rabbis and various shiurim are held.