770 Kfar Chabad: Difference between revisions

Uniform site label for Col.org.il links: ", Col.org.il (Hebrew)"
Language and style edit: natural English only, no change to facts
Line 11: Line 11:
}}
}}
[[File: 770 בכפר.jpg|thumb|The construction of 770; in the center, Rabbi [[Zushe Wilmowsky]], and to his left, Rabbi [[Menachem Lerer]]]]
[[File: 770 בכפר.jpg|thumb|The construction of 770; in the center, Rabbi [[Zushe Wilmowsky]], and to his left, Rabbi [[Menachem Lerer]]]]
'''The Agudas Chassidei Chabad Building - 770, Kfar Chabad''' is an exact replica of [[770 Eastern Parkway - Chabad World Headquarters|the Rebbe's beis midrash]] in the [[Crown Heights]] neighborhood of [[Brooklyn]]. It was built at the Rebbe's direct instruction in 5746 (1985–86). Throughout the year, tens of thousands of youths, tourists and public figures visit the building, receive a thorough explanation about Chabad Chassidus, and pray in the replica of [[The Rebbe's Room|the Rebbe's room]] located in the building.
'''The Agudas Chassidei Chabad Building - 770, Kfar Chabad''' is an exact replica of [[770 Eastern Parkway - Chabad World Headquarters|the Rebbe's beis midrash]] in the [[Crown Heights]] neighborhood of [[Brooklyn]]. It was built at the Rebbe's explicit instruction in 5746 (1985–86). Every year tens of thousands of young people, tourists and public figures visit it, hear a thorough explanation of Chabad Chassidus, and pray in its replica of [[The Rebbe's Room|the Rebbe's room]] located in the building.


In addition, the offices of the [[Kfar Chabad (weekly)|Kfar Chabad weekly]] and the [[Kehot Kfar Chabad Branch]] operate there.
It also houses the offices of the [[Kfar Chabad (weekly)|Kfar Chabad weekly]] and the [[Kehot Kfar Chabad Branch]].


==Construction of the Building==
==Construction of the Building==
[[File:בונים את 770.jpg|thumb|During construction]]
[[File:בונים את 770.jpg|thumb|During construction]]
On [[14 Tammuz]] 5745 (1985), [[The Rebbe|the Rebbe]] announced his request that a building of [[Agudas Chassidei Chabad in Eretz HaKodesh|Agudas Chassidei Chabad]] be built in [[Eretz Yisroel|the Holy Land]], and that the building be built in [[Kfar Chabad]]. Already at the yechidus held on Thursday, [[1 Tammuz|Rosh Chodesh Tammuz]] 5745 (1985), for the Chabad rabbis of Crown Heights (who wrote down his words and signed them), the Rebbe had instructed that a house named after [[The Rebbe Rayatz|the Frierdiker Rebbe]], modeled on 770, be built in Kfar Chabad, to serve for prayer, study and the spreading of the wellsprings. The Rebbe added that the money for the construction would be in his hands<ref name="ah196">Rabbi Yechiel Krisch, "The Rebbe's Letters", lesson 196: "[https://historic-treasures.sites.tab.bot/p/rebbes-letters/196.html Why do we build 770 replicas?]", 27 Sivan 5784.</ref>.
On [[14 Tammuz]] 5745 (1985), [[The Rebbe|the Rebbe]] asked that a building of [[Agudas Chassidei Chabad in Eretz HaKodesh|Agudas Chassidei Chabad]] be built in [[Eretz Yisroel|the Holy Land]], in [[Kfar Chabad]]. Already at a yechidus on Thursday, [[1 Tammuz|Rosh Chodesh Tammuz]] 5745 (1985), for the Chabad rabbis of Crown Heights (who wrote down his words and signed them), the Rebbe had instructed that a house named after [[The Rebbe Rayatz|the Frierdiker Rebbe]], modeled on 770, be built in Kfar Chabad for prayer, study and spreading the wellsprings, adding that he would take responsibility for the funding<ref name="ah196">Rabbi Yechiel Krisch, "The Rebbe's Letters", lesson 196: "[https://historic-treasures.sites.tab.bot/p/rebbes-letters/196.html Why do we build 770 replicas?]", 27 Sivan 5784.</ref>.


Ahead of [[Tishrei]] 5746 (1985), R' Gershon Sudakevitz, a member of the [[Kfar Chabad]] council, traveled to the Rebbe's court. With no prior knowledge of engineering or architecture, he and another bochur measured the outer dimensions of [[770 Eastern Parkway - Chabad World Headquarters|770]].
Ahead of [[Tishrei]] 5746 (1985), R' Gershon Sudakevitz, a member of the [[Kfar Chabad]] council, traveled to the Rebbe, and with no background in engineering or architecture, he and a bochur measured the exterior of [[770 Eastern Parkway - Chabad World Headquarters|770]].


In [[Kislev]] 5746 (1985), approval to erect the building was received from the Interior Ministry in Israel.
In [[Kislev]] 5746 (1985), approval to erect the building was received from the Interior Ministry in Israel.


===Laying of the Cornerstone===
===Laying of the Cornerstone===
Half a year after [[The Rebbe|the Rebbe's]] instruction to erect the building, on Tuesday, the day on which "ki tov" was said twice, [[26 Teves]] 5746 (1986), the moving ceremony of laying the cornerstone for the "Agudas Chassidei Chabad Building, Ohel Yosef Yitzchak Lubavitch" was held, with the participation of thousands of Chabad Chassidim. The cornerstone was poured by young schoolchildren, in accordance with the Rebbe's words in his letter printed in [[Likkutei Sichos]] that the laying of a cornerstone should be done by schoolchildren. Words of blessing at the ceremony were delivered by the rabbi of the village, Rabbi [[Mordechai Shmuel Ashkenazi]]<ref name="th23">Col.org.il Archive, "Historical Documentation", recording 17: "[https://historic-treasures.sites.tab.bot/p/col-history/022.html#s2 Laying of the Cornerstone of 770 Kfar Chabad – Part 2]" (Hebrew).</ref>. Also taking part in the laying of the cornerstone were the chairman of the Nachlas Har Chabad council, Rabbi Mordechai Gorodetzky, the architect Rabbi [[Mordechai Menashe Gorelik]], and the rabbi of Nachlas Har Chabad, Rabbi [[Yitzchak Yehuda Yeruslavsky]]<ref name="th23"/>.
Half a year after [[The Rebbe|the Rebbe's]] instruction, on Tuesday – the day on which "ki tov" was said twice – [[26 Teves]] 5746 (1986), thousands of Chabad Chassidim attended the moving cornerstone ceremony of the "Agudas Chassidei Chabad Building, Ohel Yosef Yitzchak Lubavitch" The cornerstone was poured by young schoolchildren, following the Rebbe's letter printed in [[Likkutei Sichos]] that cornerstones should be laid by schoolchildren. Words of blessing were delivered by the village rabbi, Rabbi [[Mordechai Shmuel Ashkenazi]]<ref name="th23">Col.org.il Archive, "Historical Documentation", recording 17: "[https://historic-treasures.sites.tab.bot/p/col-history/022.html#s2 Laying of the Cornerstone of 770 Kfar Chabad – Part 2]" (Hebrew).</ref>. Also taking part were the chairman of the Nachlas Har Chabad council, Rabbi Mordechai Gorodetzky, the architect Rabbi [[Mordechai Menashe Gorelik]], and the rabbi of Nachlas Har Chabad, Rabbi [[Yitzchak Yehuda Yeruslavsky]]<ref name="th23"/>.


Ten days earlier, in the midst of the [[Farbrengen|farbrengen]] of [[Shabbos Kodesh|Shabbos]] [[Parshas Vayechi]], [[16 Teves]] 5746 (1986), [[The Rebbe|the Rebbe]] gave a bottle of "mashkeh" to the distinguished Chassid R' [[Aryeh Leib Kaplan]], chairman of the [[Irgun HaGag|umbrella organization]] of Chabad institutions in [[Eretz Yisroel|the Holy Land]] and head shliach to the holy city of [[Tzfas]], and instructed him to distribute from the "mashkeh" to those attending the upcoming cornerstone ceremony in [[Kfar Chabad]].
Ten days earlier, during the [[Farbrengen|farbrengen]] of [[Shabbos Kodesh|Shabbos]] [[Parshas Vayechi]], [[16 Teves]] 5746 (1986), [[The Rebbe|the Rebbe]] gave a bottle of "mashkeh" to the distinguished Chassid R' [[Aryeh Leib Kaplan]], chairman of the [[Irgun HaGag|umbrella organization]] of Chabad institutions in [[Eretz Yisroel|the Holy Land]] and head shliach to the holy city of [[Tzfas]], instructing him to share it with those attending the upcoming cornerstone ceremony in [[Kfar Chabad]].


===Continuation of Construction===
===Continuation of Construction===
Construction progressed sluggishly, and at the [[Farbrengen with the Rebbe|farbrengen]] of [[Lag BaOmer]] 5746 (1986), the Rebbe spoke about the fact that construction had begun but had not yet been completed. On that occasion, the Rebbe also instructed that the entire building be completed by [[12 Tammuz]] 5746 (1986). The request was received in the Holy Land with no advance preparation, after only the skeleton of the building had been completed, when none of those involved in the construction believed it was actually possible to finish all the construction work in less than two months, especially since it was an exact replica of a distant building across the sea, using materials that were not available<ref>The building stones were manufactured in a factory by special order, and other materials needed for the construction were likewise specially ordered.</ref>
Construction progressed slowly, and at the [[Farbrengen with the Rebbe|farbrengen]] of [[Lag BaOmer]] 5746 (1986) the Rebbe remarked that it had begun but not been finished, instructing that the entire building be completed by [[12 Tammuz]] 5746 (1986). The request came unexpectedly, when only the shell stood, and none of those involved believed the work could be finished in under two months – especially as it was an exact replica of a building overseas, requiring unavailable materials<ref>The building stones were manufactured in a factory by special order, and other materials needed for the construction were likewise specially ordered.</ref>


Despite the negative forecasts, dozens of workers began taking part in the construction of the building around the clock, at all hours of the day and night<ref>Rabbi [[Shneur Zalman Hertzel|Zalman Hertzel]], who studied at [[Tomchei Temimim Lod]] that year, relates that on the way back from [[Mivtza Tefillin]] the Temimim would pass through Kfar Chabad and help with the construction of the building</ref>. Enlisted for the purpose were the chief architect of the construction, Rabbi [[Mordechai Menashe Gorelik|Mordechai Gorelik]], who devoted himself to the matter with all his soul; the work contractor, Mr. Dovid Merari; the factory manager, the Chassid R' Gershon Sudakevitz; the safety officer, architect Zev Gechtman; and the aluminum works contractor, Mr. Rami Boneh.
Despite the pessimism, dozens of workers began building around the clock<ref>Rabbi [[Shneur Zalman Hertzel|Zalman Hertzel]], who studied at [[Tomchei Temimim Lod]] that year, relates that on the way back from [[Mivtza Tefillin]] the Temimim would pass through Kfar Chabad and help with the construction of the building</ref>. Enlisted for the effort were the chief architect, Rabbi [[Mordechai Menashe Gorelik|Mordechai Gorelik]], who devoted himself to it heart and soul; the work contractor, Mr. Dovid Merari; the factory manager, the Chassid R' Gershon Sudakevitz; the safety officer, architect Zev Gechtman; and the aluminum works contractor, Mr. Rami Boneh.


Against all forecasts, the miracle happened and the construction was finished on time. The [[Chanukas HaBayis|dedication]] took place on the eve of [[15 Tammuz]] 5746 (1986). In a reply sent by telephone to the Kfar Chabad council, the Rebbe instructed that the dedication celebration be held on Tuesday, 15 Tammuz, and that on Shabbos Kodesh, 12 Tammuz, it be announced in all the synagogues of Kfar Chabad<ref name="ah196"/>. On the eve of 15 Tammuz and on the night following 15 Tammuz, a yechidus for guests was held for those who had come to visit the Rebbe's court in the days around the festival of redemption of 12–13 Tammuz, and during the yechidus the Rebbe spoke about the dedication celebration taking place in Kfar Chabad.
Against all expectations, the building was miraculously finished on time. The [[Chanukas HaBayis|dedication]] took place on the eve of [[15 Tammuz]] 5746 (1986). In a reply sent by telephone to the Kfar Chabad council, the Rebbe instructed that the dedication celebration be held on Tuesday, 15 Tammuz, and that on Shabbos Kodesh, 12 Tammuz, it be announced in all the synagogues of Kfar Chabad<ref name="ah196"/>. On the eve of 15 Tammuz and the following night, at a yechidus for guests who had come for the 12–13 Tammuz festival of redemption, the Rebbe spoke about the dedication in Kfar Chabad.


The celebration itself was combined with the 19th annual bar mitzvah party for the children of IDF heroes who fell in battle defending Eretz Yisroel, and according to police estimates, more than twenty-five thousand people took part in the celebration in Kfar Chabad. The master of ceremonies was Rabbi [[Naftali Roth]], and the speakers were Rabbi [[Yisroel Leibov]], chairman of [[Tzeirei Agudas Chabad|Tzach]], who read the Rebbe's telegram to the celebrants; Rabbi [[Mordechai Shmuel Ashkenazi]], the rabbi of Kfar Chabad; the council chairman, Rabbi [[Menachem Lerer]]; Brigadier General Benny Dekel; the United States Ambassador to Israel, Mr. Thomas Pickering; the Prime Minister and Foreign Minister, Mr. [[Yitzchak Shamir]]; Minister Avraham Verdiger; and the [[Chief Rabbinate|Chief Rabbi]], Rabbi [[Mordechai Eliyahu]], who was also honored with affixing the mezuzah.
The celebration was combined with the 19th annual bar mitzvah party for children of fallen IDF soldiers, and according to police estimates more than twenty-five thousand people attended. The master of ceremonies was Rabbi [[Naftali Roth]], and the speakers were Rabbi [[Yisroel Leibov]], chairman of [[Tzeirei Agudas Chabad|Tzach]], who read the Rebbe's telegram to the celebrants; Rabbi [[Mordechai Shmuel Ashkenazi]], the rabbi of Kfar Chabad; the council chairman, Rabbi [[Menachem Lerer]]; Brigadier General Benny Dekel; the United States Ambassador to Israel, Mr. Thomas Pickering; the Prime Minister and Foreign Minister, Mr. [[Yitzchak Shamir]]; Minister Avraham Verdiger; and the [[Chief Rabbinate|Chief Rabbi]], Rabbi [[Mordechai Eliyahu]], who was also honored with affixing the mezuzah.


==The Plans==
==The Plans==