Chomas Anash: Difference between revisions
Navbox was inside an HTML comment: place it so it displays |
Internal links: link the first mention of articles that the Hebrew edition links to |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
'''Chomas Anash''' was a fundraising project that operated in 5753 (1992–93) with the goal of expanding the center of Chabad Chassidus at [[770 Eastern Parkway - Chabad World Headquarters|770]] in [[Crown Heights]], in accordance with the Rebbe's directive in [[Kuntres Beis Rabbeinu Shebebavel]] | '''Chomas Anash''' was a fundraising project that operated in 5753 (1992–93) with the goal of expanding the center of Chabad Chassidus at [[770 Eastern Parkway - Chabad World Headquarters|770]] in [[Crown Heights]], in accordance with the Rebbe's directive in [[Kuntres Beis Rabbeinu Shebebavel]]. | ||
==History== | ==History== | ||
| Line 12: | Line 12: | ||
Ultimately an expansion plan took shape. It included building an additional basement floor beneath the existing one, to house restrooms, service rooms and private cubicles. The beis midrash on the basement floor would be expanded into the space of that floor's restrooms. The basement floor would also be extended up to the edge of the street, both toward [[Eastern Parkway]] and toward [[Kingston (Street)|Kingston]] Street, so that altogether the area of the beis midrash would increase by fifty percent. In addition, the area of the women's section would be tripled relative to what it had been before the expansion. | Ultimately an expansion plan took shape. It included building an additional basement floor beneath the existing one, to house restrooms, service rooms and private cubicles. The beis midrash on the basement floor would be expanded into the space of that floor's restrooms. The basement floor would also be extended up to the edge of the street, both toward [[Eastern Parkway]] and toward [[Kingston (Street)|Kingston]] Street, so that altogether the area of the beis midrash would increase by fifty percent. In addition, the area of the women's section would be tripled relative to what it had been before the expansion. | ||
The expansion work itself began on 11 Nissan 5751 (1991). The main donor was Rabbi [[Yosef Yitzchak Gutnick]], chairman of the "Building Fund". | The expansion work itself began on 11 [[Nissan]] 5751 (1991). The main donor was Rabbi [[Yosef Yitzchak Gutnick]], chairman of the "Building Fund". | ||
==Chomas Anash== | ==Chomas Anash== | ||
| Line 25: | Line 25: | ||
The expansion work was cut off in its midst on [[Gimmel Tammuz|3 Tammuz]] 5754 (1994). Because of this, "Chomas Anash" never received its proper place as in the original plan. During the various renovations carried out at the site over the years, the wall in the basement lobby with the donors' names was removed, and coat closets and a kitchenette for hot drinks were installed in its place. The plaques were kept in the storeroom in the basement of 770 until they were discarded in 5771 (2010–11) following a renovation. | The expansion work was cut off in its midst on [[Gimmel Tammuz|3 Tammuz]] 5754 (1994). Because of this, "Chomas Anash" never received its proper place as in the original plan. During the various renovations carried out at the site over the years, the wall in the basement lobby with the donors' names was removed, and coat closets and a kitchenette for hot drinks were installed in its place. The plaques were kept in the storeroom in the basement of 770 until they were discarded in 5771 (2010–11) following a renovation. | ||
==Further | ==Further Reading== | ||
*'''[[770 Eastern Parkway - Chabad World Headquarters|Beis Chayeinu 770]]''', Machon Heichal Menachem, Jerusalem | *'''[[770 Eastern Parkway - Chabad World Headquarters|Beis Chayeinu 770]]''', Machon Heichal Menachem, Jerusalem | ||